Type of Waste (must be segregated)
|
Fee
(per ton)
|
1. Clean soil and gravel received and stored for reuse on site
|
$0.00
|
2. Land grubbing such as stumps, roots and small bushes which may be ground and used for beneficial purposes on site
|
$10.00
|
3. Concrete and bricks which can be crushed and used on site for service roads including temporary roads in the landfill cells
|
$23.00
|
4. Asphalt roofing shingles, other hydrocarbon-based materials, and waste glass which can be processed for reuse
|
$23.00
|
5. Non-treated wood which can be ground and used for fuel, compost or other beneficial purposes on site
|
$23.00
|
6. Clean segregated metals, such as structural steel, rebar piping, etc., emanating from construction/demolition projects
|
$23.00
|
7. Other inert materials such as gyproc, non-friable asbestos siding, and non-recoverable metal studs, etc, which can be disposed in the designated C&D disposal area
|
$23.00
|
8. Mixed C&D waste will be disposed of in the secure landfill cell & accepted for the regular fee
|
$64.00
|
Inquiries from C&D generators and contractors can be made directly to the Westmorland-Albert Solid Waste Facility, at (506) 877-1050 or fax at (506) 877-1060.
|
|
Hours of Operation
Administration
Monday - Friday, 8:30am - 4:30pm
Site
Monday - Friday, 7:30am - 4:00pm
Saturday, 8:30am - 2:00pm
HHW Depot
Friday, 10:00am - 3:00pm
Saturday, 9:00am - 1:00pm
|
2011 Tipping Fees
The Tipping Fee for landfill waste
for the year 2011 has been
set at $64.00 per metric ton.
|
